Upcoming Features

What's new at the CECC?

Here are some new features to look forward to when the 52,000 square foot expansion project is complete:

  • a 3-lane pool with multi-level teaching area;
  • a brand-new full-service library with maker space;
  • a fitness centre and studio;
  • a large gymnasium with updated court lines for all the sports – including pickleball, and a large bright walking track overlooking the gym;
  • a café that will help fuel both active and casual visitors alike or provide a boost to those cheering from the sidelines;
  • an outdoor rink and pavilion behind the CECC (Coming in winter 2024)
  • outdoor water filling stations for people and pets near the soccer fields;
  • more pedestrian-friendly access throughout the complex linking visitors to outdoor facilities, paths and Caledon Town Hall.
Share Upcoming Features on Facebook Share Upcoming Features on Twitter Share Upcoming Features on Linkedin Email Upcoming Features link
<span class="translation_missing" title="translation missing: en-US.projects.blog_posts.show.load_comment_text">Load Comment Text</span>