Albion Vaughan Road Sound Barrier Post-Construction Questionnaire

Share Albion Vaughan Road Sound Barrier Post-Construction Questionnaire on Facebook Share Albion Vaughan Road Sound Barrier Post-Construction Questionnaire on Twitter Share Albion Vaughan Road Sound Barrier Post-Construction Questionnaire on Linkedin Email Albion Vaughan Road Sound Barrier Post-Construction Questionnaire link

The Town of Caledon has now substantially completed the construction of the new concrete noise attenuation fence along Albion Vaughan Road. This project was undertaken by the Town to reduce the noise levels from the existing and future vehicle and truck traffic on Albion-Vaughan Road in the rear yard amenity areas of the abutting lots. The remaining restoration works and boulevard tree replanting along Albion Vaughan Road within the project limits will be completed after the Region of Peel finishes the on-going sanitary sewer improvement project, which is anticipated in late 2023.

With the completion of the noise attenuation fence, the Town is interested in hearing from the affected residents about the outcomes of the project. We would greatly appreciate you rating your response to the following survey.


We would appreciate the return of the questionnaire by Friday (October 7, 2022).


Please feel free to submit any further comments/questions to the Town’s representatives below. Thank you for your time

Shun Cheung, P.Eng., PMP

Project Manager, Capital Infrastructure

Engineering Services, Town of Caledon

6311 Old Church Road

Caledon, ON L7C 1J6

Tel: 905-584-2272 x4040

E-mail: shun.cheung@caledon.ca

Paul LaPalme, P.Eng.

Project Manager

Chisholm Fleming & Associates
317 Renfrew Drive, Suite 301

Markham, ON L3R 9S8

Tel: 905-474-1458
E-mail:
paul.lapalme@chisholmfleming.com

The Town of Caledon has now substantially completed the construction of the new concrete noise attenuation fence along Albion Vaughan Road. This project was undertaken by the Town to reduce the noise levels from the existing and future vehicle and truck traffic on Albion-Vaughan Road in the rear yard amenity areas of the abutting lots. The remaining restoration works and boulevard tree replanting along Albion Vaughan Road within the project limits will be completed after the Region of Peel finishes the on-going sanitary sewer improvement project, which is anticipated in late 2023.

With the completion of the noise attenuation fence, the Town is interested in hearing from the affected residents about the outcomes of the project. We would greatly appreciate you rating your response to the following survey.


We would appreciate the return of the questionnaire by Friday (October 7, 2022).


Please feel free to submit any further comments/questions to the Town’s representatives below. Thank you for your time

Shun Cheung, P.Eng., PMP

Project Manager, Capital Infrastructure

Engineering Services, Town of Caledon

6311 Old Church Road

Caledon, ON L7C 1J6

Tel: 905-584-2272 x4040

E-mail: shun.cheung@caledon.ca

Paul LaPalme, P.Eng.

Project Manager

Chisholm Fleming & Associates
317 Renfrew Drive, Suite 301

Markham, ON L3R 9S8

Tel: 905-474-1458
E-mail:
paul.lapalme@chisholmfleming.com

  • CLOSED: This survey has concluded.
    Complete Form
    Share Albion Vaughan Road Sound Barrier Post-Construction Questionnaire on Facebook Share Albion Vaughan Road Sound Barrier Post-Construction Questionnaire on Twitter Share Albion Vaughan Road Sound Barrier Post-Construction Questionnaire on Linkedin Email Albion Vaughan Road Sound Barrier Post-Construction Questionnaire link
Page last updated: 12 Oct 2022, 12:09 PM